25. Position a Front Top Plate
(angle cut on edge) on to top of wall
framing. Butt the straight cut end up to
Side Top Plate and align flush with the
inside of Door Header. When correctly
aligned, attach into Header with
4 - 2” screws.
24. Position one Side Top Plate (angle cut on both ends) on top wall
framing. Top Plate should be evenly spaced from front to back and aligned
flush with the inside of wall framing. Attach into wall framing with 4 - 2”
screws.
Top Plate aligned flush
with inside of wall framing.
On ends,
screwing on
slight angle
provides
more strength
Front Top Plate butted up
against Side Top Plate
with angled edge to
outside.
Aligned flush
with inside of
Door Header.
1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 12
Commentaires sur ces manuels